Gaisburg storage shed

Material & Size

PVC polyester membrane type 3 (Mehler Valmex FR1000)

completion

Phase 1 Completion 2025
Phase 2 Currently under construction

Location

Ulmer Str. 140/144
70188 Stuttgart

Our service

Planning, manufacturing, delivery and installation of the 96 membrane lenses

Objektplanung / Ingenieurplanung

sbp - schlaich bergermann partner
Stuttgart

Ausführungsplanung Membrane

Alfred Rein Ingenieure GmbH
Stuttgart

building owner

Stuttgart Tramways AG (SSB)
Schokenriedstraße 50
70565 Stuttgart

Following a fire at the Gaisburg depot, SSB Stuttgart commissioned the construction of a new, modern, and future-proof depot. The project aimed not only to replace the destroyed infrastructure but also to create a building that meets the highest standards of safety, functionality, and architecture.

The new building innovatively combines timber and membrane construction, setting a new standard both architecturally and technically. ITF participated in this project as a subcontractor for Müller Dach & Solar, which formed a joint venture with Müller Blaustein for roofing. Within this project consortium, ITF was responsible for the implementation of the membrane construction work.

A key advantage of the membrane construction lies in the material's fire-resistant properties: In the event of a fire, the membrane surfaces open or disintegrate in a controlled manner, allowing smoke and heat to be directed upwards. This significantly reduces the uncontrolled spread of fire within the building – a crucial safety aspect, especially considering the previous fire, in which the flames were able to spread almost unhindered throughout the entire depot.

The new depot was built in two phases. This phased construction model ensured that the bus fleet could resume full operation immediately after the completion of the first phase, and that SSB Stuttgart's ongoing operations were only minimally disrupted during construction.

The result is a functionally optimized, fire-safety-engineered, and architecturally sophisticated building that meets the long-term requirements of public transportation and simultaneously sets new standards for the use of membrane construction in industrial halls.